summary refs log tree commit diff
path: root/kernel/sched/core.c
diff options
context:
space:
mode:
authorChengming Zhou <zhouchengming@bytedance.com>2022-08-18 20:48:03 +0800
committerPeter Zijlstra <peterz@infradead.org>2022-08-23 11:01:19 +0200
commitdf16b71c686cb096774e30153c9ce6756450796c (patch)
tree91b3b04f50be7489b5d8c0ccca0abf4a3e79ced9 /kernel/sched/core.c
parent7e2edaf61814fb6aa363989d718950c023b882d4 (diff)
downloadlinux-df16b71c686cb096774e30153c9ce6756450796c.tar.gz
sched/fair: Allow changing cgroup of new forked task
commit 7dc603c9028e ("sched/fair: Fix PELT integrity for new tasks")
introduce a TASK_NEW state and an unnessary limitation that would fail
when changing cgroup of new forked task.

Because at that time, we can't handle task_change_group_fair() for new
forked fair task which hasn't been woken up by wake_up_new_task(),
which will cause detach on an unattached task sched_avg problem.

This patch delete this unnessary limitation by adding check before do
detach or attach in task_change_group_fair().

So cpu_cgrp_subsys.can_attach() has nothing to do for fair tasks,
only define it in #ifdef CONFIG_RT_GROUP_SCHED.

Signed-off-by: Chengming Zhou <zhouchengming@bytedance.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Reviewed-by: Vincent Guittot <vincent.guittot@linaro.org>
Link: https://lore.kernel.org/r/20220818124805.601-8-zhouchengming@bytedance.com
Diffstat (limited to 'kernel/sched/core.c')
-rw-r--r--kernel/sched/core.c25
1 files changed, 5 insertions, 20 deletions
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index e74e79f783af..603a80ec9b0e 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -10238,36 +10238,19 @@ static void cpu_cgroup_css_free(struct cgroup_subsys_state *css)
 	sched_unregister_group(tg);
 }
 
+#ifdef CONFIG_RT_GROUP_SCHED
 static int cpu_cgroup_can_attach(struct cgroup_taskset *tset)
 {
 	struct task_struct *task;
 	struct cgroup_subsys_state *css;
-	int ret = 0;
 
 	cgroup_taskset_for_each(task, css, tset) {
-#ifdef CONFIG_RT_GROUP_SCHED
 		if (!sched_rt_can_attach(css_tg(css), task))
 			return -EINVAL;
-#endif
-		/*
-		 * Serialize against wake_up_new_task() such that if it's
-		 * running, we're sure to observe its full state.
-		 */
-		raw_spin_lock_irq(&task->pi_lock);
-		/*
-		 * Avoid calling sched_move_task() before wake_up_new_task()
-		 * has happened. This would lead to problems with PELT, due to
-		 * move wanting to detach+attach while we're not attached yet.
-		 */
-		if (READ_ONCE(task->__state) == TASK_NEW)
-			ret = -EINVAL;
-		raw_spin_unlock_irq(&task->pi_lock);
-
-		if (ret)
-			break;
 	}
-	return ret;
+	return 0;
 }
+#endif
 
 static void cpu_cgroup_attach(struct cgroup_taskset *tset)
 {
@@ -11103,7 +11086,9 @@ struct cgroup_subsys cpu_cgrp_subsys = {
 	.css_released	= cpu_cgroup_css_released,
 	.css_free	= cpu_cgroup_css_free,
 	.css_extra_stat_show = cpu_extra_stat_show,
+#ifdef CONFIG_RT_GROUP_SCHED
 	.can_attach	= cpu_cgroup_can_attach,
+#endif
 	.attach		= cpu_cgroup_attach,
 	.legacy_cftypes	= cpu_legacy_files,
 	.dfl_cftypes	= cpu_files,